Quayside Skylights
Book a free survey

Cleadon skylights and rooflights for commuter homes

Cleadon is a suburban village in South Tyneside, 10.3 road miles east of Newcastle. If you want a skylight or rooflight here, tell us what sort of building it is, and we begin there.

Book a free survey

Street of modern brick semis with roof windows and neat front lawns
Bathroom with a glass shower screen and stone tiles under a flat rooflight

A commuter's house with one dim corner

Cleadon is largely residential and works as a commuter village, which suggests homes that get reshaped as lives change: a kitchen knocked through, a loft claimed for a bedroom, a bathroom with no outside wall. Rooms like that rarely get enough daylight from the walls alone. The roof is the surface that still faces the sky, and a rooflight puts it to use.

What goes in a Cleadon roof

Each product below suits a different roof and room, and we choose after seeing yours. Roof lanterns, Flat roof rooflights, Roof windows, VELUX windows, Electric rooflights, Energy efficient rooflights, Misted rooflight replacement, Walk-on rooflights, Conservation rooflights, Sun tunnels.

Cleadon homes

From village homes to a finished window

Four questions for a Cleadon job: what kind of village and homes we are working in, how the survey goes, which planning route a house or a flat must take, and which product suits the room you want to brighten.

What kind of homes does a rooflight job in Cleadon usually start with?

Short answer

Homes in a residential village now in South Tyneside, where owners reshape the layout to suit their lives. We take each house as we find it, since a roof cannot be guessed from a postcode.

Cleadon is described as a suburban village, one that grew into a commuter place after its farming days. Until 1974 it sat in the historic County Durham, and today South Tyneside Council looks after it. It has two churches, a primary school and a commercial core of shops and pubs, which is a fair outline of a settled place where people stay put and adapt what they have.

What that tells us, and what it does not

It tells us the jobs here are likely to be a household changing its own house: giving a gloomy room better light, or adding a window to a loft turned bedroom. It does not tell us the roof. Housing within one village can run from older cottages to later semis, and a street of look-alikes can still hide an extension at the back. So we ask you what you have, and then we go and look.

Rooms that call for a rooflight

Four kinds of room suit a rooflight in a village like this. A hallway or landing without a window. A bathroom boxed into the centre of the plan. A kitchen that now stretches back under a flat roof. A loft bedroom under the slope. Each has a different relationship to the roof, and that relationship decides the product.

A dim room is a design problem, not a defect

A back room or a central passage can be dim simply because the plan put walls around it, and that is no failing in the house. It simply means the roof is the place to look for light. Before we propose anything, we ask what the room is for, because a landing wants a gentle glow, a kitchen wants working light, and a bedroom wants darkness on demand.

Conservation in the village core

The core of Cleadon was designated a conservation area in 1975, and the area was later widened to take in the windmill and the open grassland near it. A conservation area, on its own, does not remove permitted development for a rooflight on a house, but an Article 4 direction or a condition on an earlier consent can. A listed house needs listed building consent for almost any rooflight. If your home is in or beside the village core, say so when you get in touch, so that the council question is raised before any order.

Cost pressures on a Cleadon roof

Keeps it lower

  • A small fixed unit in a roof of plain, straightforward construction
  • Easy access from the ground or a single scaffold lift
  • Replacing like with like in an opening that is already framed
  • A single rooflight with standard glazing and no extras

Pushes it higher

  • A large or custom-sized unit that needs structural changes around it
  • Several rooflights in one visit, with extra framing and flashing
  • Roof coverings that need careful cutting or specialist flashings
  • Electric opening, solar blinds or other fitted controls

Those lists show what pushes a Cleadon quote one way or the other. The fixed written quote itself comes only after the survey.

What happens when someone comes to survey my Cleadon roof?

Short answer

Someone goes over the roof on the outside, goes into the loft, measures where the opening will fall, and talks the room through with you. The survey costs nothing, and it comes first because we cannot price a rooflight we have not seen.

The survey is where a Cleadon job actually begins. Nothing is ordered and nothing is priced until someone has been up, looked, and measured.

Outside the house

Weather hits the outside first, so we begin there. The roof covering is named, whether slate, plain tile, a concrete tile or a flat membrane, because it sets the flashing and the way the opening is formed. We note the pitch, the position of the ridge and any neighbouring structure that will affect access for the fitting.

Inside the roof space

Up in the loft we see what a roof window has to squeeze between: the rafters, any purlins and the insulation. A flat roof is read from below as well, where the joists and the deck show how much can be changed. If a sun tunnel is on the table, we follow its path down from slope to ceiling and note whatever blocks it.

In the room

Then we stand where you will sit or stand. A rooflight is not placed by tape alone. Where the sun reaches, where you will want to look out, and how the furniture is arranged all affect the position. We also hear what you want from the room: brightness, fresh air, a view of sky, or all three.

What you receive afterwards

After the survey you receive a quote in writing with a set figure on it, which only alters if the work does. Seen first, priced second, and nothing owed for the visit.

If you rent out or share the building

Mention it early if your building is split into flats or a landlord holds the roof. That alters who has to sign what, and it is far easier to learn at survey than on the doorstep at fitting.

Do I need the council's permission for a rooflight in Cleadon?

Short answer

That depends on the building. A flat requires planning permission from South Tyneside Council. A house is usually covered by permitted development, and a listed house needs listed building consent. Flats and houses follow different routes.

The first thing to find out about any Cleadon rooflight is which route it takes. The answer follows from the type of building, not from the product.

Upstairs, downstairs and blocks

Owners of flats cannot rely on householder permitted development. That covers the upper and lower halves of a Tyneside flat, a converted villa or a purpose-built block alike. Want a rooflight in any of them and you apply to South Tyneside Council for planning permission. Ownership is a separate hurdle. Your lease or title names whoever answers for the top of the building, and any neighbour with a say in what happens up there. Read it, then have that conversation before spending a penny.

Houses

For a house the position is easier. Most rooflights on houses fall under permitted development within set limits, so a planning application is not needed. Our planning guide sets the limits out. Two things can change that: an Article 4 direction, or a condition on an earlier planning permission. Either may remove the right, and the council is the place to ask whether either covers your address.

Listed houses

A listed house keeps its permitted development on the planning side, but almost any rooflight on it needs listed building consent, and the consent is what decides the job. For a historic building the sort of rooflight matters a great deal, and the conservation-style rooflights we fit are designed with that in mind.

Building Control

Planning permission is one matter. Cutting a new opening in the roof is also building work, which must be notified to Building Control, either at the local authority or through a registered building control approver. Where a job needs notifying, the notifying falls to us.

Which route a Cleadon rooflight takes
BuildingPlanning sideWho to ask
A flat of any sortPlanning permission neededSouth Tyneside Council, plus the other owner
A houseUsually permitted developmentThe council, if an Article 4 direction may apply
A listed houseListed building consent as wellSouth Tyneside Council

Which rooflight is right for which room in a Cleadon home?

Short answer

Pitched loft rooms suit roof windows, windowless landings and bathrooms suit sun tunnels, and flat-roofed extensions suit flat rooflights or lanterns. The room tells us the job, then the roof tells us the unit.

With the route clear and the roof surveyed, the choice of product becomes practical. Think of it room by room.

The loft bedroom

A loft with a sloping ceiling wants a roof window or two. The window must clear the rafters, give a usable view from where the bed sits, and open if you want the room to breathe. Over a bedroom the inner pane is laminated. Our roof windows page shows the choices.

The landing or bathroom with no window

Where a loft sits above a room and no outside wall is available, a sun tunnel fits well. A tube runs from a small cap on the roof down to a diffuser panel in the ceiling, so daylight arrives without anyone being able to look in. It is also the least disruptive way to light a space, since the loft is left mostly alone.

The extended kitchen

A kitchen that was pushed backwards beneath a flat roof suits a rooflight of almost any size, up to a lantern. A fixed unit gives light. An opening one adds air above a cooker. A lantern adds height to the room, and the glazing on all of them must meet the Part L limits for an existing dwelling. See how flat rooflights suit a Cleadon extension.

Blinds, ventilation and glare

A south-facing roof window in summer can turn a loft into an oven, and a bare one at night shows a black square. Both are solved at the planning stage rather than afterwards. Blinds made for the specific window, vents or opening sashes, and the choice of glass all reduce glare and heat. Raise these when we survey, and the quote will include the parts that matter for your room.

Putting a price on it

Once the product is picked, the written quote follows. On the costs page you can read what shifts a price, though no figure is quoted there, because it depends on your roof. If a neighbouring village such as East Boldon has caught your eye, the same approach applies there.

Cleadon rooflight queries, one by one

Does living near Cleadon's conservation area stop me fitting a skylight?

Not by itself. A conservation area does not take away permitted development for a rooflight on a house, though an Article 4 direction or an old planning condition can. We help you confirm the position with South Tyneside Council before you order.

My Cleadon home is the upper half of a flat. What should I do first?

Open your lease or title first, as it names who answers for the roof and which neighbour, if any, must give consent. After that comes the planning step: a flat cannot use householder permitted development, so South Tyneside Council has to grant permission.

Can you fit a rooflight where I have no loft access?

Usually yes, but we need to understand the structure first. A flat roof can be read from below, and a pitched one can sometimes be seen from a hatch. At survey we work out what is practical for your particular ceiling.

What does the Building Control notification cover?

A new opening in a roof counts as building work and is notified to Building Control, whether at the local authority or with a registered building control approver. When it applies, that notification is ours to make.

How long does a Cleadon rooflight guarantee last?

Workmanship is guaranteed for 10 years, and the guarantee is in writing. It covers how the rooflight was fitted. The document comes with the finished job, so you hold the terms yourself.

Ten years on our workmanship, in writing.

We handle the Building Control notification. Your price is fixed and written after the survey.

Book your free survey

No obligation. We survey before we price.

Book a free survey